Itron B34 regulator orifice change instructions

How to Change an Itron B34 Regulator Orifice?

In the following article, we answer, “How do I change my Itron B34 regulator orifice? Of course, these instructions apply to all Itron B34: R, N, M, and D natural gas regulators. In addition to the Itron guidelines, it is important to adhere to your company’s procedures.

Request a Quote

B34 Natural Gas Regulator

The Itron B34 Regulator is ideal for many commercial and industrial burners, gas engines, boilers, and furnaces. The B34’s fast response makes it well-suited for mid-range applications where quick on/offloads cause shock difficulties. The unit is reasonably priced and provides versatility to meet challenging applications. Itron gas regulators offer the highest level of safety with available internal monitor and relief options to control gas flow.

How to Change an Itron B34 Orifice?

  1. Itron B34 regulator orifice change instructionsLocate and remove the two bolts holding the diaphragm case to the valve body.
  2. Carefully pull the diaphragm case away from the valve body. Inspect the valve seat, valve body and valve body gasket for any debris, damage, or deterioration. Replace the valve body gasket.
  3. Note the loading ring’s position. The loading ring must be replaced in the same position. Use a marker to indicate the position of the loading ring’s notch on the valve body (see Figure 1).
  4. Place your thumbs in the neck of the loading ring. Gently open the loading ring and remove (see Figure 2).
  5. Remove the orifice using a 1-7/16-inch thin-wall socket wrench.
  6. Apply pipe thread sealant (Rector Seal #5) on the orifice threads. (See Figure 3.) Begin threading the orifice by hand, using the ratchet to finish tightening. Torque to 600 inch-pounds. Do not over-tighten the orifice. Warning: Over tightening the orifice can cause irreparable damage. Torque to 600 inch-pounds.
  7. Replace the loading ring to its original position. Verify the orifice retention beads seat against the orifice.
  8. Reattach the diaphragm case to the valve body. Tighten the bolts in an alternating fashion; tighten each bolt one-half way. Tighten both screws completely; torque to 100-inch pounds.
  9. Slowly pressurize the system. Verify the regulator locks up and regulates properly.

For the recommendation of tools and parts needed and the loading ring position, download the Itron instructions.

Images and information courtesy of the Itron Gas Regulator.

Client Testimonials

  • Having vendors such as Linc Energy Systems is paramount to assure product quality.

    John Atwater

    Lead Technician

  • Linc Energy Systems has a great product line, and their customer service can’t be beat!"

    Mark Flemmer

    Engineering Support Coordinator

  • Linc Energy Systems has always provided leadership, state-of-the-art technology, and exemplary customer service.

    Randall Bishop

    Natural Gas Specialist

  • Great product knowledge, prompt response and we don’t have issues getting our products in a timely manner… we can always count on Linc Energy Systems’ reliable service.

    Edward G. Ortega

    Purchasing Agent

  • Linc Energy Systems is the contract manufacturer for our odorization system. We are grateful for our affiliation, which has been vital to our success. The staff is responsive, collaborative, communicative, and places great effort in prioritizing our needs.

    Amanda Koplin

    CEO, Pipeline Conditioning

    Houston, TX

  • The odorization equipment training class was very informative, insightful, and hands-on. I was able to develop a deeper understanding of the unit thanks to this course.

    Andrew McIntosh

    Pipeline Conditioning, OPs Manager

  • The GPL Standard 10000 technical course was fundamental to my ability to understand and operate the GPL 10000. All who operate or maintain the GPL 10000 would benefit from this course. I can confidently perform the maintenance required to keep the system operating at peak efficiency.

    Brennen Hamilton

    Pipeline Conditioning, Senior Field Engineer

Your privacy mattersWe use essential cookies to keep this site working. With your permission, we also allow optional cookies and third-party content, such as videos. Choose what you allow. You can change your choice at any time in Privacy settings. Privacy policy.

Accept all Reject optional