Linc Energy Blog

Providing an outlet to voice thoughts on bridging fossil fuels, like natural gas to alternative energy.

Operator Qualification Program Provision 2: evaluating the individual

By Susan on
Susan
Susan Bender started selling to the natural gas industry in 1980. In 1990 she f
User is currently offline
Jan 25 in Utility Contractor Services 0 Comments

In my earlier post, Operator Qualification Program Provision 1: identify covered tasks, I discussed how regulations require pipeline operators to prepare a written Operator Qualification Plan. The first step in the plan is to identify the covered tasks and create an OQ task list, and the second step is to evaluate the individuals while performing the tasks to ensure they are properly trained.

Evaluating the employee or contractor means to test them and maintain documented evidence to support that the individual was tested and passed in a manner which reflects that he or she has performed the task and recognized and reacted appropriately to normal and abnormal operating conditions (AOC). The person can be evaluated through written or oral examinations, observations while performing the task, or in a classroom or simulated situation, but it must be documented that the person has the knowledge, skill and ability (KSA) to perform each covered task.

The Operator Qualification (OQ) plan must cite specific acceptable performance standards that need to be met for each task. The standards may include third party evaluations, like contractors, vendors, associations or government agencies.

The operator will be expected to demonstrate through written documentation, that the employee or contractor(s) met the KSA for each task. Should there be any critical requirements for a task, like a physical ability to perform such task, it must be demonstrated that the individual is capable through documentation.

The testing in the OQ program must include questions or hands-on demonstrations for abnormal operating conditions. Examples of abnormal operating conditions, in which the operator may be expected to react to, are:

  • Fire
    Among the recommended course topics in Linc Energy Systems OQ courses is Abnormal Operating Conditions. 
  • Odor report
  • Leaking gas or product
  • Component failure
  • Operation of a safety device
  • Unintended valve closure
  • Overpressure
  • Under-odorized gas 
  • Corroded pipe
  • Low pipe-to-soil potentials

Some abnormal operating conditions can impact the performance of any task, such as gas odor. While other abnormal operating conditions only affect specific covered tasks. In either case, operators must determine the relevant AOCs and cite how they expect their employees or contractors to successfully respond.

If an operator chooses to accept evaluations of others, like an Operator Qualification Training vendor, or contractors, associations, etc., the operator must make sure the evaluations address the KSAs to perform the covered task and respond to abnormal operating conditions appropriately.

Evaluating the employee or contractor to ensure that they demonstrate the knowledge, skills and abilities to perform the covered tasks is the responsibility of the operator. Even if the operator hires OQ training company, they must ensure the testing is conducted with expectations cited in a written OQ plan, and the evaluations and tests must be documented and made available for a safety inspection.

In my next OQ posting I will discuss step #3 in the OQ Plan: Allow individuals who are not qualified to perform a covered task if directed and observed by an individual who is qualified.

Linc Energy Systems offers an effective balance between hands-on and classroom instruction. For more information visit Operator Qualification Training.

(1) OQ Guide for Small Distribution Systems

Tags: operator qualification (OQ), OQ Training
Hits: 143
Rate this blog entry
5 votes

About the author

Susan

Susan Bender started selling to the natural gas industry in 1980. In 1990 she founded Linc Energy Systems, where she remains as President and CEO. She attributes her success to her philosophy, “The customer is king (or queen),” which remains part of her company’s mission.

Trackbacks

Trackback URL for this blog entry

Comments

No comments made yet. Be the first to submit a comment

Leave your comment

Guest
Guest Wednesday, 22 February 2012

LINC Energy Systems Inc.

Energizing Our Future

(303) 697-6701 | (303) 697-6744 fax

info@lincenergysystems.com

11919 W. I-70 Frontage Rd. North

Unit #109

Wheat Ridge, Colorado 80033