Linc Energy Blog

With the attitude of “let’s not blow it – good planets are hard to find,” the Linc Energy Blog is writing about energy. We’ll explore alternative energy and conventional energy. We’re interesting in providing an outlet to voice thoughts on bridging fossil fuels like natural gas to alternative energy.

Viewing entries from Susan
Susan

Susan

Susan Bender started selling to the natural gas industry in 1980. In 1990 she founded Linc Energy Systems, where she remains as President and CEO. She attributes her success to her philosophy, “The customer is king (or queen),” which remains part of her company’s mission.

Blog entries tagged in one-call

National 811 Day – before digging call 811

by Susan
Susan
Susan Bender started selling to the natural gas industry in 1980. In 1990 she f
User is currently offline
Tuesday, 02 August 2011 Category Damage Prevention 0 Comments

August 11 is National 811 Day. Help spread the word about this free service to identify utility lines before digging, to avert the disruption of service, the threat of litigation and the loss of life or limb.

Tags: 811, one-call, call before you dig, 811 pipeline damage prevention
Read More Hits: 943
Rate this blog entry
11 votes

April is National Safe Digging Month

by Susan
Susan
Susan Bender started selling to the natural gas industry in 1980. In 1990 she f
User is currently offline
Tuesday, 12 April 2011 Category Damage Prevention 0 Comments

811On a recent blog post by the US Department of Transportation, we’re reminded that April is National Safe Digging Month. According to their blog, digging is still the leading cause of pipeline damage. Last year there were 53 accidents involving excavations which led to five fatalities.

“Failure to call before digging can result in property damage, tragic accidents and even fatalities. While these types of incidents have declined over the last ten years, one out of every three pipeline accidents involve people who did not call 811 first,” said PHSMA Administrator Cynthia Quarterman.

The DOT reminds us that calling 811 is not a recommendation, it’s the law. It not only applies to contractors – it means homeowners too! As homeowners are tempted this spring to garden, dig for a fence, or any other excavation, remember to call 811 before any work commences to assure that underground utilities don’t need to be located. If they do to be identified, utility locators will locate the lines and the service is free.

Help spread awareness to call 811 before you dig.
 

Reference:

Tags: 811, one-call, call before you dig, 811 pipeline damage prevention
Read More Hits: 677
Rate this blog entry
9 votes

Pipeline safety: simple ways to promote damage prevention

by Susan
Susan
Susan Bender started selling to the natural gas industry in 1980. In 1990 she f
User is currently offline
Monday, 11 October 2010 Category Damage Prevention 0 Comments

Why risk the lives of workers, or damage to the environment or incur litigation costs and penalties, when there are simple ways to promote damage prevention of your pipeline?

According to the Office of Pipeline Safety, the single greatest cause of accidents among natural gas distribution and transmission lines is digging by third party excavators.1 The PHMSA’s (Pipeline and Hazardous Materials Safety Administration) website also suggests “a major cause of pipeline accidents is careless digging.”2

In June of this year, there were two back-to-back accidents in Cleburne and Darrouzett, Texas, where third party excavators damaged natural gas lines resulting in a rupture and explosion. Many were injured and three people died. In both accidents the pipelines were not clearly marked. At the Johnson County incident, there was only one permanent pipeline marker and it was about a quarter of a mile away, obscured by high vegetation. Enterprise Pipeline, the owner of the pipeline was found to be in violation of six pipeline safety rules and fined $120,000.3

The AGA (American Gas Association) states that the Natural Gas Industry spends in excess of six billion dollars each year in safety programs which include: 811 or “One-Call” program, marking pipelines, inspections and awareness. Yet, with all the programs and precautions taken, it comes down to one thing – pipeline safety begins with visibility. If you can see it – it’s more likely you won’t hit it and you’ll avoid an incident. 

Improve visibility of pipelines to promote damage prevention

pipeline markerKeeping visibility in mind, there are some simple and relatively inexpensive ways to promote damage prevention of pipelines by improving the visibility of the underground utilities:

  • Pipeline Markers – the U.S. Department of Transportation requires that signs mark an approximate location of a pipeline. In general, they are placed at road, railroad and waterway crossings, except in urban areas where line locator services are available.  Rhino Marking and Protection Systems revolutionized the Damage Prevention industry when they introduced their TriView marking system in 1997.  The marker provides 360° visibility, is impact resistant, durable, weather resistant and green.  
  •  call before you dig 811"Call Before You Dig” or “One-Call” Program – 811 is a relatively new federally-mandated program developed to provide an excavator a way to have the utilities marked prior to excavation.

      

  • Wrap Pipes for Visible Protection While Excavating – After calling 811 and the facilities have been marked, a contractor can carefully expose the pipeline and install a pipeline wrap which improves the visibility and protects the pipeline integrity during excavation. View the video below to demonstrate how Safety Wrap offers pipeline protection during excavation.

Damage prevention starts before digging

There is a proactive way companies can protect themselves from costly litigation and fines, like those penalties Enterprise Pipeline is currently facing. The CGA One-Call Systems and Damage Prevention Best Practices recommend that a contractor take and document the excavation site before digging. 4

“If locate markings are adequately documented through the use of photographs, video tape, or sketches before excavation work begins, it will be easier to resolve disputes if an underground facility is damaged due to improper marking, failure to mark, or markings that have been moved, removed, or covered. It is important for excavators and locators to document the location of markings before excavation work begins. The primary purpose of this best practice is to avoid unnecessary litigation and expensive legal fees for all parties involved.”
 

 Damage Prevention Best PracticesBy following this CGA Best Practice by marking ines before a hit, the excavator protects themselves against expensive litigation and penalties like Enterprise is currently facing. There are commercial “hit kits” which provide contractors marking posts and measurement tools needed to create photographic documentation which can be used to keep you out of court.

  

Perhaps we can learn from the recent tragic accidents in Texas. There are simple and relatively inexpensive ways to improve visibility of underground facilities and prevent accidents. We could better use programs like the “Call Before You Dig.” We should comply with DOT line marker regulations. We could enhance excavation methods by wrapping pipelines during excavating, and we could proactively document excavation sites before digging.

Picture above:  The Rhino HIT Kit is compliant with CGA Best Practices 5-11, where the contractor clearly documents markings and protect him or her from costly litigation.

 SafetyWrap video:


1 Parfomak, P. CRS Report for Congress – Pipeline Safety and Secrurity: Federal Programs, 2008. Page 13.

2 PHMSA. Retrieved on October 6, 2010, from (http://www.phmsa.dot.gov/portal/site/PHMSA/menuitem.ebdc7a8a7e39f2e55cf2031050248a0c/?vgnextoid=2c6924cc45ea4110VgnVCM1000009ed07898RCRD&vgnextchannel=f7280665b91ac010VgnVCM1000008049a8c0RCRD&vgnextfmt=print#QA_2
 

3 LUNA, T., September 1, 2010. Report: Human error caused June natural gas pipeline explosion that killed 1 in Johnson County. Retrieved October 6, 2010, from http://www.dallasnews.com/sharedcontent/dws/dn/latestnews/stories/090210dnmetexplosion.affe1b96.html
 

4 CGA Common Ground Alliance Best Practices Version 7.0. Retrieved October 6, 2010 from, http://www.commongroundalliance.com/Content/NavigationMenu/Best_Practices/Best_Practices_2010/BP_7.0_Final_March2010.pdf

 

Tags: pipeline safety, damage prevention, 811 pipeline damage prevention, call before you dig, one-call, 811
Read More Hits: 3035
Rate this blog entry
13 votes

Call 811 before digging – it’s the law!

by Susan
Susan
Susan Bender started selling to the natural gas industry in 1980. In 1990 she f
User is currently offline
Friday, 08 October 2010 Category Damage Prevention 0 Comments

Since the San Bruno explosion, the concern of nationwide pipeline corrosion has become a hot issue in the press. However, according to the Office of Pipeline Safety, the single greatest cause of accidents among natural gas distribution and transmission lines is digging by third party excavators (1).

Call before you digIn fact, the AGA (American Gas Association) sites that “nearly 60% of the incidents on utility distribution pipelines are due to excavation damage.” This certainly in indicative of the recent tragic excavation accidents in Texas this June where three people were killed and eleven injured.

In 1998, congress enacted a law establishing a national “Call Before You Dig” or “One-Call” safety program. It took years to bring the program to its current status, and in 2007 the CGA (Common Ground Alliance) launched the national “Call Before You Dig” program to increase public awareness of the one-call or 811 program for all underground facilities. The program allows all excavators and homeowners who may be digging, to call one number nationwide to arrange for marking or identifying underground utilities in an area that will be excavated.

How does the one-call or 811 program work?

The one-call program pertains to homeowners as well as contractors. Many homeowners discount their projects as not warranting an 811 call. How deep are you planning to dig? If you’re digging 12” or more you should call, but if in doubt always call.

Homeowners installing fences, mailboxes or decks, planting trees or bushes, building water features (ponds, waterfalls) or working with concrete should call 811. In fact, homeowners routinely fail to call and cause accidents which disrupt services of entire neighborhoods. There have been accidents which have resulted in injury or death. When failing to call and there is an accident, it is likely the homeowner (or contractor) will become the recipient of steep penalties and maybe even litigation.

To avoid the consequences of not complying, three days before any project which requires excavation, simply call 811. Your call will be routed to a utility notification center in your state. The 811 representative will notify all Tier I utility owners of the locate request. The representative will provide the excavator contact information for any Tier II utility owners, and it becomes the responsibility of the homeowner or excavator to call them.

Most locate crews will arrive in a few days and mark the underground utilities in the area you called about. Remember, once the lines are marked DO NOT DIG on top of any mark and be aware that a locate is considered by law to be good within 18” on either side of the locate mark. Also keep in mind that the locate marks are only good for up to 30 days (if they are still visible), and if you haven’t completed your digging by then you’ll have to call 811 again.

 

Keep in mind, you do not have to hire a private locate company to excavate. However, if you intend to engineer a project you should call a reliable private locate company.

You can find state specific information on 811 at http://www.call811.com/state-specific.aspx.
 

It’s simple – call 811 and utility locators mark the lines. 

 

(1) Office of Pipeline Safety (OPS). “Distribution Pipeline Incident Summary by Cause:
1/1/2006 - 12/31/2006.” November 13, 2007. [http://ops.dot.gov/stats/NGDIST06.HTM]
http://www.call811.com/about-us/default.aspx

 

Tags: 811, damage prevention, one-call, call before you dig, 811 pipeline damage prevention, private locate company
Read More Hits: 1207
Rate this blog entry
11 votes

LINC Energy Systems Inc.

Energizing Our Future

(303) 697-6701 | (303) 697-6744 fax

info@lincenergysystems.com

11919 W. I-70 Frontage Rd. North

Unit #109

Wheat Ridge, Colorado 80033